After over a month of research and planning, I took the step of buying an actual container. I chose what they call a "high container". It's 9'6" tall vs. the standard 8'6". I think the higher ceiling would work out nicely. We set up delivery and awaited the fun. It arrived and suddenly the true scope and physical size of this project occurred to Margot and I both. HUGE and HEAVY.

This thing is big and simply walking around, over and into it puts things into perspective. Did I mention that it's heavy too?

I pondered renting a forklift until I found out it was $500 to do so. We decided to take our chances with some 4" PVC pipe designed for sewer systems, a floor jack, bumper jack, shovel, 40' of chain and the Jeep. We waited for the mud in the yard to dry up and Chris was gracious enough to come over on his day off to lend a hand. On Friday, the fun began.

It took about 5 hours of digging, jacking ramming and cursing to get it into place. Getting it in the air was surprisingly easy, but pushing it around was not. Let's just say we were all impressed that the Jeep or one of us wasn't damaged.

Margot watched and spotted anxiously while shooting pics and cheering us on. We even gave her a shot at the floor jack and she quickly figured out why we were sweating. It's finally in place and ready for the real work to begin. I've gathered up a rough sketch of the plan, a welder, a torch, a grinder and more than a few materials and I look forward to getting a jump on it this week. Updates to follow....